construction pics

under construction
fronts finally laying out though...

backs the next thing to drop

gutted out back

tie rod notch on pass. side


my new psi gauges

and where they will be fiberglassed into a custom pod..(where ash tray used to be)

pass. side inner front wheel well (notice custom fab. work on bracketing fot the fuse box and wires)

drivers side front inner wheel well...
notice more fab brackets

DJM 3 inch dropped dream beams... had to cut a little out of a piece of crossmember/frame to get it to lay out.

New poly. bushings for the radius arms... notice the new radius arm relocator crossmember...

New tranny crossmember and another pic of the back side of the radius arm relocator crossmember and the beams

instead of fiberglassing the gauges i thought it would be cooler having it like in cut wood... i could always tweed over it if i dont like it later... but i think its cool... its rose wood.

picture of the back 4 link finished tonight.. all of it was fab work including the "bridge" over the pumpkin.

in this picture you can see the notch laying right on top of the axle... when the bags' are fully deflated the axle will lay right under the notch..

drivers side picture of the 4 link... this picture is a good shot of the lower link bar.

view from the back... good view of the pumpkin "bridge".. also on the right side you can see where we were setting up the canti bars to start the bag' mounting.

sweet pic from the back showing the frame laying on the ground.

no your eyes are not fooling you.... the ranger is laying frame...