Operation Engine Bay
Engine Before Modification.

----------------------------------------------------------------------------------------------------------------------------------------------
Stage I of Operation Engine Bay
Upper Intake Assebly COMPLETE.
Remove AEM Cold Air Intake.
Remove Throttle Body.

Removed Stock Ignition Wires.
Installed Vitek High Performance Ignition Wires.

Remove Stock Upper Intake Manifold.

---------------------------------------------------------------------------------------------------------------------------------------------
Stage II Of Operation Engine Bay
Valve Covers COMPLETE
Replace Stock Front Valve Cover with NGM Polished and Powdercoated Valve Cover

Replace Stock Firewall Valve Cover with NGM Polished and Powdercoated Valve Cover

----------------------------------------------------------------------------------------------------------------------------------------------
Stage III Of Operation Engine Bay
Intake Manifolds
Remove Fuel Rail And Stock 190cc Fuel Injectors.

Remove Lower Intake Manifold.

Install NGM Stage III Polished, Ported, & Powdercoated Lower Intake Manifold.

Install Wolfe Racing Fuel Rail, NGM Adjustable Fuel Pressure Regulator and K-Spec 290cc Fuel Injectors.

Install Hondata Intake Spacer

Install NGM Stage I Intercooled Alpine Supercharger.

Re-install Throttle Body.
Install Short Ram Intake.

----------------------------------------------------------------------------------------------------------------------------------------------
Stage IV Of Operation Engine Bay
NOT COMPLETE
.
.
Remove Stock Lower Pulley
NOT COMPLETE
.
Remove NGM Stage I upper Pulley
NOT COMPLETE
.
Install NGM 7" Pulley
NOT COMPLETE
.
Install NGM Alcohol Injection
NOT COMPLETE
.
Install NGM Stage II Upper Pulley
NOT COMPLETE
.
Retro Fit And Powdercoat Surrounding Engine Cover
NOT COMPLETE
.
.
(Yes... you can to powdercoat plastic. But only if the plastic is high temp plastic.)