10-10-04 NEW MOTOR IN CAR STARTING TO COME TOGETHER

BRIAN SHEAPARD MAKING A FLANGE TO MOUNT THE VORTCH RACE BYPASS FROM A 3" TO A 4" TURBO CLAMP TO FIT THE RIGHT SIDE OF THE INTERCOOLER. TURNED OUT GREAT!
10-11-04 MILLED 4500 FLANGE AND MADE INTAKE BOX 1/4" 6061 ALUMINUM TO SUPER VICTOR, ALL PIPING IS ALUMINUM,AND BOTH INTAKE AND DISCHARGE PIPES WERE BROUGHT THREW TOP FIREWALL WERE THE WIND SHILD WIPERS WERE. TO KEEP FIREWALL BEHIND MOTOR CLOSED OFF.
INTERCOOLER PIPING,BYPASS,WATER TANK& PUMP,FUEL CELL,BATTERY INSTALLED
NEW FUEL AND ICE TANK IN ONE. ENDED UP CUTTING THIS THING IN HALF CAUSE IT WAS CONDENSATING WATER IN THE FUEL.

BRIAN TIG WELDING THE BRACKETS TO MOUNT THE INTERCOOLER.
STILL HAVE TO WIRE UP FAST SYSTEM,FUEL AND MSD COMPONENTS. INSTALL TRANS,EXHAUST ETC ETC.
WILL HAVE BETTER PIC'S UP NEXT WEEKEND SO CHECK BACK LATER.
LATEST PIC WITH NEW HOOD ON CAR!

PIC FROM THE BIG END FFW LA 2005 PARACHUTE DEPLOYING.

8.25-167