
The project is almost complete now, only a few more steps and I should have her back on the road. I can't wait.
GO TO PAGE 5 FOR NEW PICS
So heres the list of what I have done:
New wheels/tires
New seat apholstery
New Carpet(with dynamat on the floors to keep out road noise)
Resprayed interior panels
New shifter/shift kit
New Stereo/speakers/subs
Motor Swap (350 baby, old school 350, 4 bolt)
-Edelbrock intake
-Crane Energizer Cam
-Clevite Timing Gears
-Deep oil pan(chrome)
-Edelbrock Air Cleaner
-600 cfm Holley 4bbl carb
Flowmaster 40 series mufflers, w 2.25in pipe
Cut hole in hood for clearance(air cleaner too tall.
New ceiling panel w/ camaro stitched into fabric surrounded by flames.
Dashmat w/ camaro sown in style like the emblem on the side of the car.
All new filters
New armrests
New window cranks
Rope light for soft lighting while driving(green)
(SEE OTHER PAGES FOR PICS OF PROJECT)
To do still:
Run power wires to carb(elec secondaries)
Finish fabrication on linkage for shifter
^^^things that are vital
Interior fabrication around shifter
Attach hood scoop (bolt on, then fiberglass in place)
Attach body kit
Fill fluids
-radiator
-gas
-oil
-transmission
Run power for underglow(shows only)
Get new tires mounted on new wheels
Cut fender holes for side vents
Attach Louvers
Re-Attach Spoiler
Time engine
Get car repainted
Get car back on insurance
DRIVE!!!!