What i have to work with
Clearance is set and ready for c notches
C notches are done and is ready for 4 link to start being built
3 inch wide bushings with 1/4 inch thick tabs

First bushing is in place for lower portion of 4 link

Front of link is in
place
Front and rear lower links are both in place