Here is our project 240sx in the very beginng after the SR20DET swap. Body work will come after all under-coating, powder-coating, suspension and engine work are completed.
*Not all upgrades are installed yet, that is why some are missing in the pictures.
The swap and wiring were all done in house. These are pictures of the very early stages in the swap. It takes approximately 10hrs to complete.
Full 3 inch exhaust. Megan Racing downpipe and O2 housing and Apexi cat-back.
Posted by: bigal1987
12/22/2008, 02:39pm
Hey man thats a nice S14 check out mine sometime