In the making




























Ok . He heres the stor y.
I bought the Van in March of 2008. A Friday night, brought her home. The next day, Took me twelve hours to cut Van from a 125'' wheel base to a 74'' wheel base. I cut the sliding door section all the way around including chassis. Sunday morning I got two 30'' x 4 1/2 galvanized boat trailer i-beam and welded into the uniframe slots of the Van. Connected the Van together and welded all away around it. Reinforcing every corner, every edge nice and tight.
*This is some of the work I did:
*I dropped the van from the rear moving the rear leaf spring shackle 3'' higher than stock.
*I cut my springs in the front being that no company in this world sells spindles for it. 1 1/2 circle cut, dropped it 4''.
*Welded drive shaft to a funny 18''.
*Shaved door handles, from manual to power lock kit, from manual window to power window kit.
</br> Shaved bulky factory mirrors and installed El Camino 4'' round mirrors with Chevy Emblem engraved , from JEGS.
* Installed vintage Rally wheels, 15''-6 1/2'' fronts with Mickey Thompson..28'' x 6. and shortened Rally Caps(Custom ordered also from JEGS) stainless steel trim Rings.
*Rear: 15'' x 10'' 4 1/2 rear spacing. Also with Long caps and Stainless steel trim. On 29'' x 13'' m-t.
*Installed flares and custom made my own side skirts fabricated 6'' metal studs from my job. Molded into the fiberglass flares for a one piece look. Niice. Fiberglass in everything.
* Rear and front bumpers to the scrap yard, rear being smoothed out with a roll pan and front section where the bumper was at I fabricated steel to smooth out with front spoiler, one piece. Niice.
*All brand new weather stripping all around; Doors and Windows.
*Installed a tilt steering (factory was stock).IN the future its going to have a nice aluminum grant steering wheel. But thats later, thats final touches when im done with all the dirty work.
* It has a 305 TBI which is going to be yanked right out and transplanted with a 350 with the goodies.
* Shaved side markers, Im fabricating and welding raised Bow tie emblem, 1/4'' high in its place.
*Rear lights all brand new, installed later after Paint.
* Future Billet Grill which I am fabricating myself out of polished aluminum.
* It will have a lokar automatic floor shifter, 24'' 2 bends.
*All the inside door handles will be billet, including mirror but all these Goodies will be shown when Van gets engine installed and painted.
*Not in yet but due to van not being painted yet, its going to have a visor. the A-Team rear wing.
*THATS ALL FOR NOW...PICTURES WILL BE ADDED AS I GO, OF ALL THE GOODIES.