My second 240 convertible, this time a 242 L was sacrificed.
First thing to do was to fix the rust:
Then it was time to add the supportive beams:
With those in place it was time for the cutting:
A little test spinn:
Smothing out the edges and make mounting holes for the seatbelts:
Roll it black:
Success: