The floor and stringer was rotted out bad. So out with the old and in with the new!


All the rotten balsa out the new core was made up of 2 x 6" cut to 1/2" and resigned into place. I smoothed it all out with bondo and sanded it smooth. I then layed fiberglass cloth over it all and started building the new bulkheads and stringers.












Before and after of the rear seat
















Gauges, controls, and rigging.
Faria gauges complete with 80 mph speedo, tach with digital hour meter, fuel, trim, oil, temp, volt gauges. Also added is a digital faria depth gauge.


More updates later!
page 1 Before
page 2 Trailer
page 3 Paint
Page 4 New motor
Page 5 Interior
Page 6 Finished
Page 7 79 Enchanter O/B
Page 8 WR500 Waverunners
Page 9 85 19' Enchanter (sold)
Page 10 86 BAJA Scat Cat