The Completion List
- Power windows and locks installed
- Engine, transmission, and rear end removed
- Underside of car POR-15ed (rust proof paint)
- Rear end/exhaust installed
- Gas tank painted and installed
- All new brake lines
- New KYB Gas-A-Just rear shocks and KYB GR-2 struts
- New Moog IROC front springs
- Body kit holes drilled and kit installed
- Body primed (yes, for the second time)
- Engine bay painted
- Power windows installed
- Power locks installed
- Alarm System Installed
- Motor reinstalled and running
- Transmission Back In
- RH quarter panel replaced
I'll be uploading pictures of my work as I go along.
Engine Ready For Removal and Engine Bay After Removal:
Engine In Place On The Stand:
Rear End Removed:
Engine Bay Ready For POR-15:
POR-15 Painted On:
Rear End Installed:
Chin Spoiler Mounted:
New Spring (compared to old):

Page 1: Original Pictures
Page 2: The Build [you are here]
Page 3: The Build - Continued
Page 4: Updates and Parts Pictures
Page 5: Painting