As of right now its still pretty much stock. K&N cold air intake, 20" wheels, painted calipers, sound system, soon to be bagged laying frame!


UPDATE- 11/25/08
SFBD is pretty much done, getting ready to go into paint. Painting the firewall pweter. Shaving the back tail light since water leaks in and was causing bad rust. Also, i have '00 envoy hids! Vintage air AC, abs, cruise control, Went hydroboost, back seats! Front can lay out 22's and the back may be able to fit some 24's!!! i will update soon with more picture s and such...

Update 2/16/09
Been a while since i last updated. Here is an interior shot from afew months back. Much progress has been done sice than, just do not have the pictures uploaded yet. Ill be posting this weekend with all the updates!

Update 2/24/09
The front is all back together now, horns lowered, fenders cut, finished extending the main wire harness. Almost done! need to seam seal the inside and paint it. Also, i had to firewall shaved and painted.

Update 7/25/09
The floor has been painted and all the welds seam sealed for a while now. Rear valves are mounted. Extended the main wire harness to the passenger side. Just finished installing 2 layers of FatMat from the firewall back to the rear seats. Pain in the ass, but i think will be well worth it. Heat gun, wooden roller, and lots of time is what one should expect when taking that on hah! Air tanks are mounted. New fuel cell and lines are ran. Had to section 2.5" out of stock tank to fit it under the frame rails. Then put fuel liner in the tank to reinsure the welds. New Kinetik Hc1800 power cell relocated to the rear. Made the radiator flush in the core support. relocated abs and computer.
Mounted Rear Valves
FatMat shots and Extended main Wire harness

Mounted Airtanks and Kinetik hc1800 power cell

Sectioned fuel cell and pictures of the lined inside
Radiator flush into the core support

New abs bracket mounted (located on the driver side frame rail)
The computer mounted on the firewall