The Swap PT.2
Wiring done, took hours and days to finish

Gauge cluster wiring done, messy interior
Koyo radiator installed, looks sexy

PCV piping for the intercooler, temporary set-up until I get a real intercooler




A'PEXi power intake air filter


Throttle cable connected


Ripped out ABS system

RB gauge cluster installed

