The Body Work Phase
On January 8th, 2007, the velle went to First Class Auto Restorations via a flatbed. Non-Stop Towing of Asbury Park, NJ (732)-774-7766 did the towing and great with hookin' my car.
The first time in 20 years that I had the car towed!!!More to come on the progress of the body work.
January 12th, 2007
The stripping process begins!! The whole car is being stripped of its paint. The first step is the chemical process.
January 19th, 2007
The car is stripped and the metal work has been completed already!!! This pictures shows epoxy applied to areas where the pieces of metal has been welded in.
January 24th, 2007
The major body work is complete. The epoxy has been sand off and the areas primed.
January 27th, 2007
On the 26th, Vic called me on the phone to inform me that my trans and exhaust needed to be removed so that the left floor board could be finish. With that, I went to the shop and pulled my trans and exhaust out. The next two pictures are the floors in progress. The right front toe pan is finished and the whole left floor pan is removed.
January 31st, 2007
The floor boards are complete and from the undercarriage, they have a correct stock appearance. It is very hard to tell if these floor were ever replaced. Now, I can re-install the transmission and exhaust and fire up the car again!!! Over the next few days, the block sanding and body alignment can commence. After that paint!!!!