April 12, 2006 purchase date
This is my 4th car in 2 years, been through alot of beaters, not because i'm a bad driver =)
Anyways this car is a gem here, I'm going to try and build it up to about 250rwhp, shouldn't be too difficult but we'll see, here are some details.
1989 NISSAN 240SX COUPE KA-T
Black/Grey
192,8xx kms original motor
5 speed standard
HUD speedo
pwr everything w/ sunroof
Engine/Turbo/Management
SOHC KA w/ 192,8xx original
Garret GT28R Ball Bearing Turbo
Gladman Performence Bottom-mount turbo manifold
Gladman Performence Custom intercooler piping
Gladman Performence 3" Downpipe
Custom 2.5" Straight pipe exhaust
Magnaflow muffler 2.5" tip
Tial 38mm External Wastegate w/ external dump and 1 bar spring (13.5-15psi)
FMIC 31x14x3
460cc FC Injectors (Serviced and rebuilt, basically new)
CA18DET Hotpipe w/ BOV
Z32 MAF
NGK Iridium spark plugs
300ZX Fuel filter
Cosmo short shifter
Apexi SAFC2 Black version
PLX Wideband 300
Walbaro 255hp Fuel pump
12" Electric fan
Auto meter Phantom boost gauge
Auto meter Phantom oil pressure gauge
Dual A pillar Guage pod
Automatic ECU
Removed EGR
Suspension/Brakes
K-sport Coilovers 7/5
Q45 front brake caliper/rotor conversion
Rear strut bar
Front strut bar
Konig Rewind 15x7 0-offset
1/4" spacers
300ZX Master cylinder
Other
H4 Headlight conversion
Clear sidemarkers and signals
Ungo alarm system w/ backup siren
Panasonic deck
2 8" JL Audio subwoofers in ported box
Alpine front tweeters
Alpine Amplifier
Touring Style Spoiler w/ brake light
89 Pignose w/ Zenki lip
Momo shift knob
CF style shift boot
Problems
Truck release doesn't work
Some body work
Things that I Need/Want
-ACT 6 puck clutch w/ remachined flywheel ~500
-Autogauge Phantom Monster tach 5" ~300
-91+ Front bumper or Silvia conversion or Bodykit
-Racing steering wheel w/ hub ~ 200
-Bucket/Racing seat w/ brackets ~ 600
-New Headunit ~400
May 1, 2006
Change of plans, bought myself a larger turbo, manifold, full exhaust and undergoing the install. The car is uninsured and until my license suspension lifts, I will build it into a beast. Here are some pictures in progress thanks.
Upgraded to GT28R Turbo
Old turbo out
New turbo too big w/ the AC compressor in the way
Tight fit, but will make it work...
August 10, 2006
Car is currently being completed by Jordan Gladman, its in good hands, he was kind enough to do alot of the "dirty" work and his a great guy to deal with. My license suspension lifts tomorrow and will be expecting my car to be completed soon after. Looking forward to a test tune and dyno run when I get a new clutch installed that should be arriving later this month. No pictures yet ;)
Projected RWHP: 260-270
Projected TQ: 280-290
Projected 1/4 Time: 13.5-13.9 (Heres hoping)