



THE 1994 Z28 5.7L 6SPEED, LT1 SOON TO BE 383/LT4 CAMARO "AUTOBAHN KILLER"



255/35/20" NITTO 555 TIRES/FORTE RIMS






SPEC STAGE 3+ CLUTCH AND 7 QT MOROSO OIL PAN




TWIN 58MM THROTTLE BODY/CSR ELECTRIC WATER PUMP
















RC 120MM SS CAMARO LEXAN BODY BOUGHT ON WWW.TOWERHOBBIES.COM




PAGE 1: YOUR LOOKING AT IT!!!
PAGE 2: THE BEGINING OF THE Z28
PAGE 3: THE Z28 PROJECT
PAGE 4: LAMBO DOOR PROJECT (END OF JANUARY)
PAGE 5: FRONT ENGINE REBUILD
PAGE 6: REAR END GEARS/SUSPENSION
PAGE 7: WHEELS 20" AND 17"
PAGE 8: PAINT JOB INPROGRESS NEXT MONTH PIC WILL FOLLOW
PAGE 9: BORLA 3" EXAUST SYSTEM
PAGE 10: DRIVELINE
PAGE 11: NEAR FUTURE/ON-ORDER/IN PROGRESS
PAGE 12: PARTS ADDED ON/EXTRAS
PAGE 13: MY FAV VIDEOS CHEVY KICKS ASS
PAGE 14: MY FAV CAMARO WEBSITES LINKS
PAGE 15: NEW PICS.............
PAGE 16: CLASSIC CHEVY VS. FORD AND EVERYTHING ELSE!!! IF YOU WONDER ABOUT MY TOP SPEED JUST REMEMBER I LIVE IN GERMANY AND DRIVE THE AUTOBAHN AND THE 180MPH I WAS STILL HAVE 2,000RPM LEFT, THE 1/4 MILE RUN WAS RECORDED IN GERMANY AS WELL, BUT NOT RECORDED BY A TRACK OFFICAL, THIS YEAR IT WILL BE AND IT WILL RUN THE NURBURGRING TRACK, IF YOU DON'T KNOW WHAT THE NURBURGRING IS? THE TRACK IS ON ALL PLAYSTATION GRAND TURISMO VIDEO GAMES. VIDEO WILL FOLLOW ASAP! PLEASE RATE MY Z28 RIDE, AS YOU CAN SEE IT'S NOT DONE YET. HANG IN THERE AND CHECK MY PAGE OUT EVERY WEEK FOR AN UPDATE, LOVE PEACE AND CHICKEN GREASE. STAY CHEVY FOR LIFE!!!!!I SAY AGAIN RATE IT, THANKS PEACE OUT!!!!!!!!!

WHAT THE Z28 WILL LOOK LIKE AFTER COMPLETED BUT BETTER!!!!
MORE NEW PICS ON PAGE 15, CHECK IT OUT...WELL EVERYTHING IS READY TO START, BUT THE STARTER!!!, IT TOOK A SHIT, SO I'M WAITING FOR PARTS ONCE AGAIN!!! SO THIS FRIDAY IT WILL BE RUNNING STRONG. THE FRONT END WILL BE PUT TOGETHER ALSO.
MY BOBY KIT IS FROM WWW.GOFASTPERFORMANCE.COM AND THE HOOD IS FROM www.hawksthirdgenparts.com I'M ONE OF THE FEW THAT HAVE IT THAT I'VE SEEN OR HEARD ABOUT AND AFTERMARKET KIT'S DON'T FIT WELL!!!!
FOR ALL THOSE THAT HAVE BEEN KEEPING TABS ON MY Z28. I JUST MOVED ALL TOOLS/PARTS/WHEELS AND THE RIDE TO MY NEW GARAGE, I HOPE NEXT WEEK IT WILL BE READY TO RUN TO THE BODYSHOP FOR INSTALLATION OF LAMBO DOORS, NEW PIC'S WILL FOLLOW END OF THE WEEK.......CHECK OUT PAGE 15 FOR NEW PICS FOR THIS WEEK!!!! THE Z28 LT1 IS UNDER CONSTRUCTION CHECK OUT ALL MY PAGES, TRUST ME IT'S WORTH YOUR TIME
