Page 1=Modifications (9/2005)
Page 2=More Modifications (12/2005)
Page 3=BMR suspension (4/2006)
Page 4=Things for the Drag Strip (4/2006)
Page 5=Drag Strip Pictures (4/2006)
Page 6=Cam Swap (6/2007)
Page 7=Head Swap (7/2007)
Page 8=Saleen Store Visit (12/2006)
Page 9=Motorcycle Photos (6/2007)
Page 10=2007 Nor-Cal shootout! (7/2007)
Page 11=Formula D 8/11/07 Infineon (8/2007)
Page 12=NOS (9/2007)
Page 13=STS Turbo Install (6/2008)
Page 14=Modification List (Always updated)
Page 15=Shelby Headquarters Visit (1/2009)
Page 16=Village Cafe GTG (5/2009)
Page 17=Motor Swap (9/2009)
Good Friend's 1990 Mustang
Cam Swap
Specs:
-224/224 Cam with Lobe Separation Angle=114º (Cam install guide)
-PRC Dual Springs
-Hardened chromoloy pushrods
-Titanium retainers
-Hardened Seats
-LS6 ported oil pump
-Rollmaster single roller non-adjustable timing chain
-Gasket kit
-O-ring for oil pump
-More Tool
Day One
Getting ready for the install:
Coils off:
Valve cover coming off:
Valves covers off:
Water pump being taken off:
Raidator out:
Parts taken off:
Day Two
Start of the day:
Driver side with the rockers still on, then off:
Crank pulley finally off:
Cam gear:
Cam about to come out:
Where did the cam go?
Parts taken off:
Here is a new crank bolt 16MM X 2.0pitch at 120MM long, and then compared to stock:
Here is the More tool available at Thunder Racing:
Another great tool used in the cam swap a fuel line remover:
Uh-oh, what this?:
Day Three
The cam and equipment arrives!!!
The new cam about to go in:
Cam in!
Here is the old timing chain and oil pump:
The new Rollmaster timing chain and cam gear on the left and then a comparison photo on the right of old vs. new crank gear:
The crank snout with old crank gear, then to the right is it bare, and then on the bottom is with the new Rollmaster crank gear on:
Here is a key photo (left) all the dots are lined up on the new Rollmaster timing set, and then to the right there is a gernally overview at this point:
New Ported and Polished ls6 oil pump on:
PRC dual springs by itself on the left and then on the head on the right:
Day Four
The More Tool in all its glory:
THe new valve seals installed:
Here is the old spring set up on the top left, then on the top right is the new PRC spring set up, and on the bottom is a comparison:
PRC's all on:
Rockers back on:
Day Five
All right here is the tool I made to put the pulley back on [16mm X 2.0 pitch @ 130mm long with a few washers], it worked great as seen in the photo on the right
Got the valve covers back on and cleaned them while they were off:
Finally the raidator back in:
Getting the coils back on the covers:
Almost done!!!
Alright click here for a video of my firing up with the cam for the first time
Finally done and here is the results, main mods are; LT's, ORY, Cam, LS6 intake, SLP CAI, Ported and Polished TB, done by Synergy Motorsports in Freemont, CA
Page 1=Modifications (9/2005)
Page 2=More Modifications (12/2005)
Page 3=BMR suspension (4/2006)
Page 4=Things for the Drag Strip (4/2006)
Page 5=Drag Strip Pictures (4/2006)
Page 6=Cam Swap (6/2007)
Page 7=Head Swap (7/2007)
Page 8=Saleen Store Visit (12/2006)
Page 9=Motorcycle Photos (6/2007)
Page 10=2007 Nor-Cal shootout! (7/2007)
Page 11=Formula D 8/11/07 Infineon (8/2007)
Page 12=NOS (9/2007)
Page 13=STS Turbo Install (6/2008)
Page 14=Modification List (Always updated)
Page 15=Shelby Headquarters Visit (1/2009)
Page 16=Village Cafe GTG (5/2009)
Page 17=Motor Swap (9/2009)
Good Friend's 1990 Mustang